Use the following procedure for the start-up test.
RAILA:
RAILB:
Set the load current to 10 A.
Make sure all default jumpers (J1 to J9) settings as shown in Table 4-3.
Connect probes Enable_B (TP12), VOUTB (J16, BNC cable), BPWM1 (TP55) and VOUT_B_RDY (TP23).
Set up the time / div on the oscilloscope to: 500 μs/div.
Set the trigger to channel 1 ‘Enable_B’ on the rising edge at about 1 V.
Turn on the power supply (with the voltage set to 12 V and the current limit set to 5 A).
Slide the enable switch ‘S2’ to the ON position.