Use the following instructions to
perform output the hot-short
test.
- Set the input supply voltage VIN
to 12 V and current limit of 10
A.
- Turn ON the power supply and
observe
start-up
of
output
voltage,
HGATE,
and DGATE.
- Short
the output to GND. That is, VOUT to GND with a cable and observe the
short-circuit response of LM74900-Q1 using an oscilloscope.
Figure 5-9 shows hot-short response of LM74900-Q1 on LM74900Q1EVM
evaluation
board.