Use the following instructions to
verify the overvoltage protection feature of
LM74930-Q1.
- To test 200 V Unsuppressed Load
Dump, the LD200N or similar equipment is needed as the input power supply.
- Make sure the J8 jumper setting
is set to 2-3.
- Set the input supply voltage VIN
to 24 V and current limit of 5
A.
- Turn ON the power supply and
observe
start-up
of
output
voltage.
- Now apply 200 V Unsuppressed Load
Dump using LD200N equipment.
- Observe
OVCLAMP operation of LM74930-Q1 when input voltage is above OV
threshold.