SLUUCY1 November 2023
This section describes how to properly connect, set up, and use the TPS543B25T evaluation module.
The TPS543B25T is provided with input connectors, output connectors, and test points as shown in Table 3-1 and Table 3-2.
To support the minimum input voltage with the full rated load on both outputs with the default EVM, a power supply capable of supplying greater than 30 A must be connected to J1 through a pair of 18-AWG wires or better.
For U1, the load must be connected to J2 and J3. Two pair of 18-AWG wires or better must be used for each connection. With the maximum current limit setting, the maximum load current capability is near 25 A before the TPS543B25T goes into current limit. Wire lengths must be minimized to reduce losses in the wires.
Test point TP2 provides a place to monitor the VIN input voltage with TP6 providing a convenient ground reference for U1. TP4 is used to monitor the output voltage of U1 with TP10 as the ground reference.
If modifications are made to the TPS543B25T, then the input current can change. The input power supply and wires connecting the EVM to the power supply must be rated for the input current.
REFERENCE DESIGNATOR | NAME | RELATED IC | FUNCTION |
---|---|---|---|
J1 | VIN | U1 | VIN screw terminal to connect input voltage (see Table 3-2 for VIN range). |
J2 | VOUT | U1 | PGND ground |
J3 |
GND |
U1 | VOUT screw terminal to connect load to output. |
J4 | EN_OFF | U1 | 2-pin header for enable. Add shunt to connect EN to ground and disable device. |
J5 | ENSYNC | U1 | 2-pin header to connect U2 buffer output enable to ground. Populate shunt to enable output of buffer. Remove shunt to make buffer output high impedance. |
REFERENCE DESIGNATOR | NAME | RELATED IC | FUNCTION |
---|---|---|---|
TP1 | VOUT | U1 | SMB connector to measure output voltage. When using this test point, the scope must be set for 1-MΩ termination. When using 50-Ω termination, a 2:1 divider is created. |
TP2 | VIN | U1 | VIN test point. Use this for efficiency measurements. |
TP3 | SW | U1 | SW node solder mask opening. |
TP4 | VOUT | U1 | VOUT test point. Use this for efficiency, output regulation, and bode plot measurements. |
TP5 | EN | U1 | EN test point. If user is applying an external voltage, then the external voltage must be kept below the absolute maximum voltage of the EN pin of 6 V. |
TP6 | PGND | U1 | PGND test point. Use this for efficiency measurements. |
TP7 | PGOOD | U1 | PGOOD test point. |
TP8 | AGND | U1 | AGND test point. |
TP9 | BODE+ | U1 | Used for Bode plot measurements. |
TP10 | PGND | U1 | PGND test point. Use this for efficiency measurements. |
TP11 | BODE- | U1 | Test point between voltage divider network and output voltage. Used for Bode plot measurements. |
TP12 | VCC_BUF | U1 | VDRV Voltage Supply to Buffer. |
TP13 | PGND | U1 | PGND test point. |
TP14 | SYNC | U1 | SYNC test point. |
TP15 | ISNS | U1 | Test point to measure current in load transient circuit. Gain is 20 A/V. |
TP16 | FGEN | U1 | Test point to connect function generator to load transient circuit. Slowly increase amplitude and vary slew rate of function generator for desired load step. |
TP17 | ISNS | U1 | Test point to measure current in load transient circuit. Gain is 20 A/V. |
TP18 | PGND | U1 | PGND test point. |