SLVAFU0 April 2024 TPS61377
Table 3-1 shows the example of the test condition.
Test condition | |
---|---|
Input voltage | 12V |
Output voltage | ± 19V |
Output load | ± 100mA |
And the application note uses TPS61377 to achieve the design. The switching frequency is 650kHz. Table 3-2 shows the preliminary results.
I/O condition | |||
---|---|---|---|
System Parameters | Value | Unit | Remark |
Vin(typ) | 12 | V | Typical input voltage |
VOUT1 | 19 | V | Positive power rail voltage |
VOUT2 | -19 | V | Negative power rail voltage |
Fsw | 650 | kHz | Switching frequency |
IOUT1 | 0.1 | A | Load current of positive voltage rail |
IOUT2 | 0.1 | A | Load current of negative voltage rail |
Efficiency | 90 | % | Estimated value, used 90% as default |
Ripple of VCOUT2 | 0.19 | V | 1% of VOUT |
CCHG | 0.81 | µF | Recommended CCHG that achieve desired Vout ripple |
RCHG | 0.32733 | Ω | Recommended RCHG, by using Ts = RCHG × CCHG |
Table 3-3 shows the components selection. The forward voltage of D2 and D3 are better to select the smaller to minimize the power loss of the architecture. In the previous section, the recommendation is to forward voltage of D1 and R3. For the power loss of R3 needs be carefully designed.
Components selection | |||
---|---|---|---|
System Parameters | Value | Unit | Remark |
CCHG | 4.70 | µF | Real CCHG, suggest > recommended value for derating |
RCHG | 1 | Ω | Real RCHG, suggest >= 1Ω && recommended value, use 1Ω as first |
VD2 | 0.35 | V | Real forward voltage of VD2, smaller is good |
VD3 | 0.35 | V | Real forward voltage of VD3, smaller is good |
VD1 | 0.7 | V | Recommended forward voltage of VD1=VD2+VD3 |
VD1 | 0.7 | V | Real forward voltage of VD1 |
R3 | 2.32 | Ω | Recommended R3 by using real VD1 |
R3 | 2.32 | Ω | Real VD1 resistor |
PR3 | 0.0408 | W | Average power of R3 |
Table 3-4 shows the calculation result after inputting the I/O condition and Component selection. Original gap means that the architecture without using R3 and D1. After R3, the gap can be effectively reduced.
Calculation result | |||
---|---|---|---|
System Parameters | Value | Unit | Remark |
D | 0.43 | Duty cycle of boost converter | |
Ts | 1.54 | µs | Duty time |
Ton | 0.66 | µs | Duty on time |
ICHG1 | 0.23 | A | Averaged ICHG1 |
ICHG2 | 0.18 | A | Averaged ICHG2 |
ΔVCHG | 0.033 | V | Ripple of the CCHG |
VCHG | 19.17 | V | DC voltage of the CCHG |
Original -VCOUT2 | 18.59 | V | Original negative voltage rail |
Original Gap | 0.41 | V | Original gap |
Output capacitance | 0.4603 | µF | Cout need for VOUT1 |
Optimized -VCOUT2 | 19.0005 | V | Optimized negative voltage rail |
PRCHG | 0.0408 | W | Power of RCHG |
Optimized Gap | -0.0005 | V | Optimized gap |