SLVK086A
january 2022 – may 2023
TPS7H4003-SEP
PRODUCTION DATA
1
Single-Event Effects Test Report of the TPS7H4003-SEP Synchronous Step-Down Converter
Trademarks
1
Introduction
2
Single-Event Effects (SEE)
3
Device and Test Board Information
4
Irradiation Facility and Setup
5
Depth, Range, and LETEFF Calculation
6
Test Setup and Procedures
7
Destructive Single-Event Effects (DSEE)
7.1
Single-Event Latch-up (SEL) Results
7.2
Single-Event Burnout (SEB) and Single-Event Gate Rupture (SEGR) Results
8
Single-Event Transients (SET)
9
Event Rate Calculations
10
Summary
A Appendix: Total Ionizing Dose From SEE Experiments
B Appendix: References
C Revision History
Radiation Report
TPS7H4003-SEP Synchronous Step-Down Converter Single-Event Effects (SEE)