SLVU434A
February 2011 – January 2022
TPS53125
,
TPS53126
,
TPS53127
Trademarks
1
Introduction
1.1
Description
1.2
Application
1.3
Features
2
Electrical Performance Specifications
3
TPS53127EVM-614 Schematic
4
Connector and Test Point Descriptions
4.1
Enable Switches (SW1 and SW2)
4.2
Switching Frequency Select Switch (SW3)
4.3
Test Point Descriptions
4.3.1
Input Voltage Monitoring (TP3 and TP9)
4.3.2
Channel 1 Output Voltage Monitoring (TP4 and TP8)
4.3.3
Channel 2 Output Voltage Monitoring (TP6 and TP7)
4.3.4
Soft-Start Voltage Monitoring (TP1, TP2, and TP3)
4.3.5
Switching Node Monitoring (TP3, TP5, and TP11)
4.3.6
5-V Regulator Output Monitoring (TP3 and TP10)
5
Test Setup
5.1
Equipment
5.1.1
Voltage Source
5.1.2
Meters
5.1.3
Loads
5.1.4
Oscilloscope
5.1.5
Recommended Wire Gauge
5.1.6
Other
5.2
Equipment Setup
5.2.1
Procedure
5.2.2
Diagram
5.3
Start-Up/Shutdown Procedure
5.4
Output Ripple Voltage Measurement Procedure
5.5
Equipment Shutdown
6
TPS53127EVM-614 Test Data
6.1
Efficiency
6.2
Line and Load Regulation
6.3
Output Voltage Ripple and Switching Node Waveforms
6.4
Switch Node
7
TPS53127EVM-614 EVM Assembly Drawings and Layout
8
Bill of Materials
9
Revision History
5.5
Equipment Shutdown
Shut down the oscilloscope.
Shut down V
IN
.
Shut down LOAD1.
Shut down LOAD2.
Shut down FAN.