SLVU444A
March 2011 – August 2021
TPS54429E
Trademarks
1
Introduction
2
Performance Specification Summary
3
Modifications
3.1
Output Voltage Setpoint
4
Test Setup and Results
4.1
Input / Output Connections
4.2
Start-Up Procedure
4.3
Efficiency
4.4
Light Load Efficiency
4.5
Load Regulation
4.6
Line Regulation
4.7
Load Transient Response
4.8
Output Voltage Ripple
4.9
Input Voltage Ripple
4.10
Start-Up
4.11
Eco-mode Operation
5
Test Setup and Results
6
Board Layout
6.1
Layout
7
Schematic, Bill of Materials, and Reference
7.1
Schematic
7.2
Bill of Materials
7.3
Reference
8
Revision History
4.2
Start-Up Procedure
Make sure the jumper at JP1 (Enable control) is set from EN to OFF.
Apply appropriate VIN voltage to VIN and PGND terminals at J1.
Move the jumper at JP1 (Enable control) to cover EN and ON. The EVM enables the output voltage.