Power-Up Procedure

  1. Define which converters are to be enabled or disabled by connecting the correct jumpers accordingly.
  2. Apply a DC voltage to jumper J8. Polarity is clearly marked on the silk-screen.
  3. Verify that the relevant converters are powered up by the output voltages. The whole start-up process will take less than 100 ms. PGOOD will be asserted high 32 ms after all converter outputs have reached 90% of nominal voltages.
  4. Apply loads to the output connectors (J9 and J11).