Start Up Procedure

  1. Make sure the jumper at JP1 (Enable control) is set from EN to OFF.
  2. Apply appropriate VIN voltage to VIN and PGND terminals at J1.
  3. Move the jumper at JP1 (Enable control) to cover EN and ON. The EVM will enable the output voltage.