SLVUBW5A
June 2020 – October 2020
Trademarks
1
Introduction
1.1
Performance Specification
1.2
Modification
2
Connector, Test Point and Jumper Descriptions
2.1
Connector and Test Point Descriptions
2.2
Jumper Configuration
2.2.1
JP1 (ENABLE)
2.2.2
JP2(SYNC)
3
Test Procedure
4
Schematic, Bill of Materials, and Board Layout
4.1
Schematic
4.2
Bill of Materials
4.3
Board Layout
5
Revision History
2.2
Jumper Configuration