SLVUCB8A May 2022 – September 2022 TPS25985
In this user's guide, the test procedure is described for TPS25985 eFuse. Make sure the evaluation board has default jumper settings as shown in Table 5-1.
J1 | J2 | J3 | J4 | J5 | J6 | J7 | J8 | J9 |
---|---|---|---|---|---|---|---|---|
1-2 | 5-6 | 3-4 | 1-2 | 1-2 | 3-4 | 1-2 | 2-3 | 1-2 |
Follow these instructions before starting any test and repeat again before moving to the next test:
Enable the power supply output so that the EVM gets the input power supply.