SLVUCG1
December 2022
Abstract
Trademarks
1
Introduction
1.1
Before You Begin
2
Schematic
3
EVM Setup
3.1
Jumper Connections
3.1.1
J1
3.1.2
J2
3.1.3
J3
3.1.4
J4
3.1.5
J5
3.1.6
J6
3.1.7
J7
3.1.8
J8
3.1.9
J9
3.2
Test Points
3.3
Soldering Guidelines
4
Equipment Connection and Operation
5
PCB Layout
6
Bill of Materials (BOM)
3.1
Jumper Connections