SLVUCU2
December 2023
TPS55289-Q1
1
Description
Get Started
Features
Applications
6
1
Evaluation Module Overview
1.1
Introduction
1.2
Kit Contents
1.3
Specification
1.4
Device Information
2
Hardware
2.1
Modification
2.2
Connector, Test Point, and Jumper Descriptions
2.2.1
Connector and Test Point Descriptions
2.2.2
Jumper Configuration
2.2.2.1
JP1 (ENABLE)
2.2.2.2
JP6 (SYNC)
2.2.2.3
JP7 (I2C Target Address Selection)
2.2.2.4
JP8 (Internal or External VCC Selection)
2.2.2.5
JP9 and JP10 (External Feedback and Internal Feedback Selection)
2.3
Test Procedure
3
Software
3.1
Software User Interface
3.1.1
Install USB2ANY Explorer
3.1.2
GUI Installation
3.1.3
Interface Hardware Setup
3.1.4
User Interface Operation
3.1.5
Register Map Screen
4
Hardware Design Files
4.1
Schematic
4.2
PCB Layouts
4.3
Bill of Materials
5
Additional Information
Trademarks