SLVUD10A August   2024  – September 2024 TPS25772-Q1

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  8. 2Hardware
    1. 2.1 EVM Operation
    2. 2.2 Setup
    3. 2.3 Jumper and Connector Descriptions
      1. 2.3.1 Jumper Settings
      2. 2.3.2 USB 2.0 Data
      3. 2.3.3 Aardvark Connector
      4. 2.3.4 USB2ANY
    4. 2.4 Push Buttons
  9. 3Software
    1. 3.1 Web GUI Link
  10. 4Hardware Design Files
    1. 4.1 Schematics
    2. 4.2 PCB Layouts
    3. 4.3 Bill of Materials (BOM)
  11. 5Additional Information
    1. 5.1 Trademarks
  12. 6Revision History

Setup

Items required for Operation

Figure 2-1 shows how to power and set up the TPS25772Q1EVM-CD-150 for evaluation and testing.

TPS25772Q1EVM-CD-150 EVM Connections Figure 2-1 EVM Connections