SLVUD10A August   2024  – September 2024 TPS25772-Q1

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  8. 2Hardware
    1. 2.1 EVM Operation
    2. 2.2 Setup
    3. 2.3 Jumper and Connector Descriptions
      1. 2.3.1 Jumper Settings
      2. 2.3.2 USB 2.0 Data
      3. 2.3.3 Aardvark Connector
      4. 2.3.4 USB2ANY
    4. 2.4 Push Buttons
  9. 3Software
    1. 3.1 Web GUI Link
  10. 4Hardware Design Files
    1. 4.1 Schematics
    2. 4.2 PCB Layouts
    3. 4.3 Bill of Materials (BOM)
  11. 5Additional Information
    1. 5.1 Trademarks
  12. 6Revision History

EVM Operation

Connections to achieve EVM operation:

  • Connect approx. 5.5V-18V DC power supply to the power input banana connectors.
  • Connect micro Type-B USB connector to PC to use GUI to program EEPROM.
  • Aardvark connector to program EEPROM or observe I2C traffic between TPS25772-Q1 and TPS55288-Q1 during operation.
  • Port A and Port B Type-C connectors are provided to connect to Power Delivery or Type-C sink devices or test equipment.