SNAK013 November   2022 LMK04832-SEP

 

  1.   Abstract
  2.   Trademarks
  3. 1Product Description
  4. 2Test Setup
    1. 2.1 SEL Test
    2. 2.2 SEFI Test
    3. 2.3 Test Facility
  5. 3Results
    1. 3.1 SEL Results
    2. 3.2 SEFI Results
  6. 4Summary
  7. 5References

SEL Test

A thermistor was attached to the DUT board up against the DUT to monitor the temperature. The DUT was heated with a heat gun so that the thermistor read at least 125°C. Based on the power dissipation of the DUT and the thermal modeling of the ceramic package, the junction temperature is approximately 20°C higher than the thermistor reading.

The supply current was monitored on a display in real time and also recorded by the PXI controller.