SNAU291A
October 2023 – September 2024
1
Description
Features
Applications
5
1
Evaluation Module Overview
1.1
Introduction
1.2
Kit Contents
1.3
Specification
1.4
Device Information
2
EVM Quick Start
2.1
Hardware Setup
2.2
Software Setup
2.2.1
TICS Pro GUI Setup
2.2.2
Power Up Sequence
2.3
EVM Measurements
3
Hardware
3.1
Device Operation Modes
3.2
EVM Configuration
3.2.1
Power Supply
3.2.2
Logic Input and Outputs
3.2.3
Clock Input
3.2.4
Clock Outputs
3.2.5
Status Outputs, LEDs and Test Points
4
Software
4.1
TICS Pro LMKDB1108 Software
4.1.1
Input
4.1.1.1
Input Interface Type
4.1.1.2
Input Termination
4.1.1.3
Auto Output Disable (AOD)
4.1.1.4
LOS Event
4.1.1.5
LOS Readback
4.1.2
Device Info and EVM Setup
4.1.2.1
Device Info
4.1.2.2
EVM Setup
4.1.2.3
SMBus
4.1.3
Output
4.1.3.1
SMBus
4.1.3.1.1
Programmable Output Slew Rate Control
4.1.3.2
OE# Pin Control
4.1.3.3
Side Band Interface (SBI)
5
Implementation Results
5.1
Typical Phase Noise Characteristic
6
Hardware Design Files
6.1
Schematics
6.2
PCB Layouts
6.3
Bill of Materials (BOM)
7
Compliance Information
7.1
Compliance and Certifications
8
References
9
Revision History
6
Hardware Design Files