SNOK002 February   2021 LMP2012QML-SP

 

  1.   Trademarks
  2. 1Overview
  3. 2Test Procedures
  4. 3Facility
  5. 4Results
  6.   A Appendix A: Test Results

Results

There were no functional failures at any irradiation level. All parametric measurements remained well within all LMP2012QML Dual High Precision, Rail-to-Rail Output Operational Amplifier data sheet limits for all exposure levels. All parametric measurements remained well within the production test limits which are guard-banded from the data sheet limits. The full parameter list and graphs are found in Section A.