SNVU869
august 2023
LM5185-Q1
1
Description
Get Started
Features
Applications
6
1
Evaluation Module Overview
1.1
Introduction
1.2
Kit Contents
1.3
Specification
1.4
Device Information
2
Hardware
2.1
Setup
2.2
Header Information
2.3
Test Points
2.4
Assembly Instructions
2.5
Best Practices
3
Implementation Results
3.1
Performance Data and Results
3.1.1
Conversion Efficiency
3.1.2
Output Voltage Regulation
3.1.3
Operating Waveforms
3.1.3.1
Start-up
3.1.3.2
Load Transient Response
3.1.3.3
Switching
3.2
Thermal Performance
4
Hardware Design Files
4.1
Schematic
4.2
PCB Layout
4.3
Bill of Materials (BOM)
5
Compliance Information
5.1
Compliance and Certifications
6
Additional Information
6.1
Trademarks
Get Started
Order the EVM at
ti.com
.
Read this user's guide carefully.
Prepare the bench setup per instructions. Take cautions to prevent damage by ESD when handling the EVM.
Power up the EVM by following the recommended steps.
Run tests and measurements. Take cautions of high voltage and hot temperature produced by the EVM during test.