SPRACP3C November 2019 – December 2021 AWR6843 , AWR6843AOP , IWR1443 , IWR1642 , IWR6443 , IWR6843 , IWR6843AOP
As shown in Figure 2-1, beginning with the prototype and development phase, equipment must be designed with certification in mind to catch and avoid preventable issues later in the product life cycle.