SPRACX7 April 2021 AWR1243 , AWR1443 , AWR1642 , AWR1843 , AWR1843AOP , AWR2243 , AWR2944 , AWR6843 , AWR6843AOP , IWR1443 , IWR1642 , IWR1843 , IWR6443 , IWR6843 , IWR6843AOP
Described below are the basic production checks done on a radar module at high-level:
Sensor performance validation can cover the entire range of sensor hardware and software subsystems. This document is not intended to serve as a reference for hardware bring up or validation. Instead, this section describes a high-level overview of the production line testing done on fully validated and characterized hardware to screen for issues on a production ready sensor. These issues generally arise from handling defects, environmental factors, assembly defects, and manufacturing defects.