SPRAD66B February 2023 – December 2024 AM62A3 , AM62A3-Q1 , AM62A7 , AM62A7-Q1 , AM62D-Q1 , AM62P , AM62P-Q1
Once the extracted S-parameters have been verified as causal and passive, the S-parameter plots must be inspected. TI recommends to check for the following:
The S-Parameter inspection plots are not pass or fail tests, but rather more of a guide to check if the design has a reasonable chance of performing a the required level.