SPRAD85A March 2023 – September 2024 AM62A3 , AM62A3-Q1 , AM62A7 , AM62A7-Q1
Updating the design documents periodically to capture all the requirements and design updates, observations during different stages of the custom board design is recommended. This updated information provides the basis for the documentation package and the design document is required when requesting external review support.