SPRUJ91A april   2023  – may 2023 AM68 , AM68 , AM68A , AM68A , TDA4AL-Q1 , TDA4AL-Q1 , TDA4VE-Q1 , TDA4VE-Q1 , TDA4VL-Q1 , TDA4VL-Q1

 

  1.   1
  2.   Abstract
  3.   Trademarks
  4. 1Contributions to Power
  5. 2How to Use the Tool
  6. 3Use Case
    1. 3.1 Core Processor Utilization
    2. 3.2 Key IP Frequency Selection
    3. 3.3 Memory Interfaces
    4. 3.4 PHYs
    5. 3.5 High Speed Serial Interface
    6. 3.6 Environmental
    7. 3.7 LVCMOS IOs
    8. 3.8 Buttons
    9. 3.9 Starting Use Case
  7. 4Results Sheet
    1. 4.1 Thermal Power Estimate
    2. 4.2 Peak / PDN Power Estimate
  8. 5Three Specific Pre-Loaded Use Case Results
    1. 5.1 ARM Only
    2. 5.2 Superset
    3. 5.3 Valet Park
  9. 6Summary of Power for Pre-Populated Use Cases
  10. 7Revision History

Revision History

Changes from April 4, 2023 to May 17, 2023 (from Revision * (Apr 2023) to Revision A (May 2023))

  • Updated the numbering format for tables, figures, and cross-references throughout the document.Go
  • Updated excel zip file.Go
  • Updated data in tables 5-1 and 5-2.Go
  • Updated data in Tables 5-6, 5-7, and 5-8.Go
  • Updated data in tables 5-9, 5-10, and 5-11.Go
  • Updated data in table in 6-1.Go