TIDT179A may   2020  – april 2023

 

  1.   Description
  2. 1Test Prerequisites
    1. 1.1 System Specification
    2. 1.2 Required Equipment
    3. 1.3 Testing Conditions
    4. 1.4 Considerations
  3. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Standby Efficiency Data
    4. 2.4 Dimensions
    5. 2.5 Thermal Images
  4. 3Waveforms
    1. 3.1 Switch Node
    2. 3.2 Output Voltage Ripple
    3. 3.3 Start-up Sequence
  5. 4Revision History

Test Prerequisites