TIDT202 September   2020

 

  1.   Description
  2. 1Test Prerequisites
    1. 1.1 Design Requirements
    2. 1.2 Required Equipment
    3. 1.3 Dimensions
  3. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Load Regulation
    4. 2.4 Thermal Images
  4. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Output Voltage Ripple
    3. 3.3 Load Transients
    4. 3.4 Start-up Sequence
    5. 3.5 Undervoltage Protection
    6. 3.6 Thermal Management

Switching

Switching behavior is shown in the following figures.

GUID-20200910-CA0I-MPZ3-NWKQ-WRKLHVPLLBXS-low.png
CH1: VSW
Figure 3-1 13.5V input, 5.17V no-load
GUID-20200910-CA0I-XKFK-L4GB-P63KCLXS8NFR-low.png
CH1: VSW
Figure 3-2 13.5V input, 5.17V full-load