TIDT243 December   2021

 

  1.   Description
  2.   Features
  3.   Applications
  4. 1Test Prerequisites
  5. 2Voltage and Current Requirements
  6. 3Thermal Images
  7. 4Efficiency Graphs
  8. 5Conducted Emissions
    1. 5.1 Conducted Emissions – Test Results
  9. 6Switching
  10. 7Load Transients
  11. 8Start-up Sequence
  12. 9Shutdown Sequence

Start-up Sequence

Figure 8-1 through Figure 8-4 illustrate the start-up waveforms at no load.

GUID-20210629-CA0I-VJPV-0X5V-XPBVFDB3K10Z-low.png Figure 8-1 Part A – 2.1 MHz
GUID-20210629-CA0I-BJKJ-NJVP-DD1TJ55WJ0BH-low.png Figure 8-2 Part B – 2.1 MHz
GUID-20210629-CA0I-TKFQ-5PX6-DBX9M3ZJQBZW-low.png Figure 8-3 Part B – 2.1 MHz
GUID-20210629-CA0I-FPLR-HGBS-R7XCJHZDVNVN-low.jpg Figure 8-4 Part C – 2.1 MHz