TIDT253 January   2022

 

  1.   Description
  2.   Features
  3.   Applications
  4. 1Test Prerequisites
    1. 1.1 Key System Requirements
  5. 2Testing and Results
    1. 2.1 Sensed VCR and Output Voltage Ripple Under Different Loads
    2. 2.2 Control Loop Bode Plot Comparison
    3. 2.3 Transient Response Test
    4. 2.4 References

References