TIDT259 March   2022

 

  1.   Description
  2.   Features
  3.   Applications
  4. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
  5. 2Testing and Results
    1. 2.1 Load Regulation
    2. 2.2 Efficiency Graphs
    3. 2.3 Efficiency Data
    4. 2.4 Input Power Limit
    5. 2.5 Thermal Images
  6. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Voltage Ripple
    3. 3.3 Bode Plots
    4. 3.4 Load Transients
    5. 3.5 Start-Up Sequence

Efficiency Graphs

Figure 2-2 shows the efficiency curves at 48-V input.

GUID-20220216-SS0I-DQNK-KMDZ-GTJFDG0NVG0N-low.jpg Figure 2-2 PMP22477 Rev. C Efficiency, 48-V Input