TIDT299 September   2022

 

  1.   Description
  2.   Features
  3.   Applications
  4. 1Test Prerequisites
    1. 1.1 Design Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Dimensions
  5. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
    4. 2.4 Thermal Efficiency Data
    5. 2.5 Frequency Response
  6. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Output Voltage Ripple
    3. 3.3 Load Transients
    4. 3.4 Start-Up Sequence
    5. 3.5 Bypass Operation

Start-Up Sequence

Start-up behavior is shown in the following figures.

GUID-20220802-SS0I-2QBS-FSV7-BJ2TNC13BV0X-low.pngFigure 3-11 6-V Input, 27-A Load
GUID-20220802-SS0I-5T8L-VWCT-TDZNDW2RWHHV-low.pngFigure 3-12 10-V Input, 37.5-A Load