Test Setup

  1. Install the TMDSCNCD280039C daughter card to the power board with the C2000™ MCU interposer board
  2. Connect two isolated 12-V DC power supplies to the "12Vp / GNDp" and "12Vs / GNDs" on the C2000 interposer board
  3. Connect a 400-V, 10-A power supply to the "HVBUS / PBGND" on the primary board
  4. Connect a 12-V, 250-A electronic load to the "12Vout / Vo-out" golden finger on the primary board
  5. Install power analyzer voltage and current meters, if you want to test the efficiency