8 Revision History
Changes from Revision C (October 2017) to Revision D (August 2024)
- Updated the numbering format for tables, figures, and
cross-references throughout the document Go
- Updated schematic to add switch on or off control, on board bias supply. Redesign
power on logic and inrush current protection delay circuit, voltage follower
circuit. Updated layout file. Updated heatsink. Build new boards. Redo all tests
on new boardGo