TIDUCU8A september   2022  – may 2023

 

  1.   1
  2.   Description
  3.   Resources
  4.   Features
  5.   Applications
  6.   6
  7. 1System Description
  8. 2System Overview
    1. 2.1 Block Diagram
    2. 2.2 Design Considerations
      1. 2.2.1 Framehandler
  9. 3Hardware, Software, Testing Requirements, and Test Results
    1. 3.1 Hardware Requirements
    2. 3.2 Test Setup
    3. 3.3 Test Results
      1. 3.3.1 Power Supply Inrush Tests (TCM_PHYL_INTF_ISIRM)
      2. 3.3.2 Interface Wake-Up Voltages (TCM_PHYL_INTF_IQWUH and TCM_PHYL_INTF_IQWUHL)
      3. 3.3.3 Current Sink
      4. 3.3.4 Timing Tests
  10. 4Design and Documentation Support
    1. 4.1 Design Files
      1. 4.1.1 Schematics
      2. 4.1.2 BOM
    2. 4.2 Tools and Software
    3. 4.3 Documentation Support
    4. 4.4 Support Resources
    5. 4.5 Trademarks
  11. 5Revision History

Test Results

Focus of this section of tests are the physical layer tests as describe by the IO-Link community in IO-Link Interface and System Specification publication.