This section describes how to properly connect and set up the TIDA-050031:
- Enable the Buck converter, LDO and the TPS61088-Q1 boost converter;
- Connect the positive terminal of DC power supply to J1(Vin), its GND terminal to J2 (GND);
- Turn on the DC power supply, set the load current to 1.5A;
- After one hour, when the backup battery charges up, turn off the DC power supply;
- TPS61088-Q1 starts working;
- Turn off the DC power supply.