SNOSD91B March 2019 – February 2020 LMG3410R150 , LMG3411R150
PRODUCTION DATA.
Figure 15 shows the device startup sequence. As VDD starts to build up and passes the UVLO threshold, the FAULT signal is pulled high after both LDO 5V and VNEG are built up. The VDS starts to respond to IN signal when the FAULT signal clears.