Figure 8-2 depicts a typical device programming flow. The flow is similar to the LP589x-Q1 device family with several additional initialization steps to configure the LP5899-Q1. After power up VCC and waiting until the device is in Normal state (which means that the OTP CRC is correct), the LP5899-Q1 is initialized and the FLAG_POR has to be cleared (by setting CLR_FLAG) to allow forwarding of commands. Afterwards, the commands can be forwarded to the LP589x-Q1 daisy chain.