SLVSGG1A February 2022 – September 2022 TPS7H5005-SEP , TPS7H5006-SEP , TPS7H5007-SEP , TPS7H5008-SEP
PRODUCTION DATA
Before the primary outputs of the controller will start switching, the following conditions must be met:
Once all of the aforementioned conditions are satisfied, the soft-start process will be initiated.