SLLSFW2 September   2023 TUSB211A

PRODUCTION DATA  

  1.   1
  2. Features
  3. Applications
  4. Description
  5. Revision History
  6. Pin Configuration and Functions
  7. Specifications
    1. 6.1 Absolute Maximum Ratings
    2. 6.2 ESD Ratings
    3. 6.3 Recommended Operating Conditions
    4. 6.4 Thermal Information
    5. 6.5 Electrical Characteristics
    6. 6.6 Switching Characteristics
    7. 6.7 Timing Requirements
    8. 6.8 Typical Characteristics
  8. Detailed Description
    1. 7.1 Overview
    2. 7.2 Functional Block Diagram
    3. 7.3 Feature Description
      1. 7.3.1 High-Speed EQ
    4. 7.4 Device Functional Modes
      1. 7.4.1 Low-Speed (LS) Mode
      2. 7.4.2 Full-Speed (FS) Mode
      3. 7.4.3 High-Speed (HS) Mode
      4. 7.4.4 High-Speed Downstream Port Electrical Compliance Test Mode
      5. 7.4.5 Shutdown Mode
  9. Application and Implementation
    1. 8.1 Application Information
    2. 8.2 Typical Application
      1. 8.2.1 Design Requirements
      2. 8.2.2 Detailed Design Procedure
        1. 8.2.2.1 Test Procedure to Construct USB High-Speed Eye Diagram
          1. 8.2.2.1.1 For a Host Side Application
          2. 8.2.2.1.2 For a Device Side Application
      3. 8.2.3 Application Curves
    3. 8.3 Power Supply Recommendations
    4. 8.4 Layout
      1. 8.4.1 Layout Guidelines
      2. 8.4.2 Layout Example
  10. Device and Documentation Support
    1. 9.1 Receiving Notification of Documentation Updates
    2. 9.2 Support Resources
    3. 9.3 Trademarks
    4. 9.4 Electrostatic Discharge Caution
    5. 9.5 Glossary
  11. 10Mechanical, Packaging, and Orderable Information

Package Options

Mechanical Data (Package|Pins)
Thermal pad, mechanical data (Package|Pins)
Orderable Information

Application Curves

GUID-42935026-67B0-4014-9589-6916499958B4-low.gifFigure 8-2 Near End Eye Measurement Set-Up With Pre-Channel Cable
GUID-7DA339C2-3B13-4B3D-A75B-4017C595C54B-low.png
Figure 8-3 2 Meter Pre-Channel Without TUSB211A
GUID-BD935293-877D-4A41-B3FC-D482FA3B3D87-low.png
Figure 8-5 5 Meter Without TUSB211A
GUID-DC71C13C-CAC2-452D-AEF6-AE6EB5DF9EB6-low.png
Figure 8-7 5 Meter Pre-Channel With TUSB211A EQ=2
GUID-73A2302D-1858-4439-BE01-03CBAF5E3929-low.png
Figure 8-4 2 Meter Pre-Channel With TUSB211A EQ=1
GUID-74B3BE6F-1711-4754-9A37-9B4052BF6A43-low.png
Figure 8-6 5 Meter Pre-Channel With TUSB211A EQ=1
GUID-AA704C29-B2D9-4CA2-95CD-9E06AFA0A0B0-low.gifFigure 8-8 Near End Eye Measurement Set-Up With Post-Channel Cable
GUID-528BE490-5927-45B5-9F4C-E70458AD23E7-low.png
Figure 8-9 1 Meter Post-Channel Without TUSB211A
GUID-1F833079-B710-49B7-B422-DB20284EF02B-low.png
Figure 8-11 2 Meter Post-Channel Without TUSB211A
GUID-B026D8E3-209B-4886-9A44-72A505156B90-low.png
Figure 8-13 4 Meter Post-Channel Without TUSB211A
GUID-8A5B9148-9355-43E0-BCAC-4B81E419304D-low.png
Figure 8-10 1 Meter Post-Channel With TUSB211A EQ=0
GUID-91EAD0E6-3509-4465-95DC-55FA9C3CD941-low.png
Figure 8-12 2 Meter Post-Channel With TUSB211A EQ=1
GUID-B207137E-6A3C-4A5D-B9DE-64AFAF441484-low.png
Figure 8-14 4 Meter Post-Channel With TUSB211A EQ=2