9 Revision History
Changes from Revision C (March 2019) to Revision D (October 2023)
- DRV パッケージを「事前情報」から「量産データ」に変更
Go
- 「アプリケーション」セクションにリンクを追加
Go
- Changed 5-V to 5.5-V in title of 5.5-V Load Regulation vs
IOUT
figureGo
- Added Startup Sequencing sectionGo
- Added Device Nomenclature section Go
Changes from Revision B (March 2019) to Revision C (March 2019)
- Deleted thermal pad from DBV pin out drawing Go