JAJSF56D April 2018 – October 2023 TLV758P
PRODUCTION DATA
During normal operation, the input current to the LDO is approximately equal to the output current of the LDO. During start-up, the input current is higher as a result of the inrush current charging the output capacitor. Use Equation 6 to calculate the current through the input.
where: