JAJSMQ4 june 2023 TPS389006
PRODUCTION DATA
Upon Power-On-Reset, the TPS389006 needs to make a decision whether to run BIST or not, based on the value of the TEST_CFG.AT_POR register bit. Assuming that ECC on this register is performed after BIST has checked the ECC logic itself, it is not possible to guarantee its data integrity before running BIST.