JAJSDB7B June 2017 – October 2021 TPS7A83A
PRODUCTION DATA
Soft-start directly controls the output start-up time and indirectly controls the output current during start up (inrush current).
Figure 8-2 shows that the external capacitor at the NR/SS pin (CNR/SS) sets the output start-up time by setting the rise time of the internal reference (VNR/SS).