9 Revision History
Changes from Revision B (June 2021) to Revision C (November 2021)
- Added Power and Control Voltage Requirements topicGo
- Added Rail-to-Rail Operation topicGo
- Updated title from Enable and Disable Delays to Enable and
Disable Delays and Propagation Delay
Go
- Added Characteristics of CBTLV Family topicGo
- Added Applications sectionGo
Changes from Revision A (June 2020) to Revision B (June 2021)
- Updated the numbering format for tables, figures and cross-references throughout the document.Go
Changes from Revision * (July 2003) to Revision A (June 2020)