SLVU775A September   2012  – November 2021 TPS5402

 

  1.   Trademarks
  2. 1Introduction
  3. 2Background
  4. 3Board Layout
  5. 4Bench Test Setup Conditions
    1. 4.1 Headers Description and Jumper Placement
    2. 4.2 Jumpers and Switches
  6. 5Power-Up Procedure
  7. 6Schematic and Bill of Materials
  8. 7Revision History

Introduction

This document presents the information required to operate the TPS5402 as well as the support documentation including schematic and bill of materials.