SLVUCH5 july   2023 LMQ64480-Q1 , LMQ644A0-Q1 , LMQ644A2-Q1

 

  1.   1
  2.   Abstract
  3.   Trademarks
  4. 1EVM Description
    1. 1.1 Features and Electrical Performance
  5. 2EVM Performance and Specifications
  6. 3EVM Photo
  7. 4Test Setup and Procedure
    1. 4.1 EVM Connections
    2. 4.2 Test Equipment
    3. 4.3 EVM Setup
      1. 4.3.1 Input Connections
      2. 4.3.2 Output Connections
  8. 5Test Data and Performance Curves
    1. 5.1 Efficiency and Load Regulation Performance
    2. 5.2 Waveforms and Plots
    3. 5.3 EMI Performance
    4. 5.4 Thermal Performance
  9. 6EVM Documentation
    1. 6.1 Schematic
    2. 6.2 Bill of Materials
    3. 6.3 PCB Layout
  10. 7Device and Documentation Support
    1. 7.1 Device Support
      1. 7.1.1 Development Support
        1. 7.1.1.1 Custom Design With WEBENCH® Tools
    2. 7.2 Documentation Support
      1. 7.2.1 Related Documentation

Test Equipment

Power Supply: Connect to VIN(-) and Ammeter1. The power supply must be capable of supplying 16 A. Adjustable voltage range must be from 3 V to 36 V.

Multimeters:

  • Voltmeter 1: Measure the input voltage at VINS+ to VINS–.
  • Voltmeter 2: Measure the CH1 output voltage at VOUT1S+ to VOUT1S–.
  • Voltmeter 3: Measure the CH2 output voltage at VOUT2S+ to VOUT2S–.
  • Ammeter 1: Measure the input current. Connect to the power supply and VIN(+).

Electronic Load:

  • Load 1: Connect to VOUT1(+) and VOUT1(-). The electronic load must be capable of sinking 6 A.
  • Load 2: Connect to VOUT2(+) and VOUT2(-). The electronic load must be capable of sinking 6 A.