SLVUCK9A august   2023  – august 2023 TPS562203 , TPS562206

 

  1.   1
  2.   Description
  3.   Trademarks
  4. Features
  5. Applications
  6. Hardware Image
  7. Evaluation Module Overview
    1. 4.1 Introduction
    2. 4.2 Kit Contents
    3. 4.3 Reference
    4. 4.4 Device Information
  8. Performance Specification Summary
  9. Output Voltage Setpoint
  10. Test Setup and Results
    1. 7.1 Input, Output Connections
    2. 7.2 Start-Up Procedure
    3. 7.3 Efficiency
    4. 7.4 Load Regulation
    5. 7.5 Line Regulation
    6. 7.6 Load Transient Response
    7. 7.7 Start-Up
    8. 7.8 Shutdown
    9. 7.9 Output Voltage Ripple
  11. Hardware Design Files
    1. 8.1 Schematic
    2. 8.2 Layout
    3. 8.3 Bill of Materials
  12. Reference
  13. 10Revision History

Start-Up Procedure

  1. Make sure that the jumper at JP1 (Enable control) pins 1 and 2 are covered to shunt EN to GND, disabling the output.
  2. Apply appropriate input voltage to VIN (J1-2) and GND (J1-1).
  3. Move the jumper at J1 (Enable control) pin 2 and 1 (EN and GND) to enable the output.