SLVUCY4
June 2024
LM5190-Q1
1
Description
Features
Applications
5
1
Evaluation Module Overview
1.1
Introduction
1.2
Kit Contents
1.3
Specification
1.4
Device Information
2
Hardware
2.1
Test Setup and Procedure
2.1.1
EVM Connections
2.1.2
Test Equipment
2.1.3
Recommended Test Setup
2.1.3.1
Input Connections
2.1.3.2
Output Connections
2.1.4
Test Procedure
2.1.4.1
Basic Test Procedure
3
Implementation Results
3.1
Test Data and Performance Curves
3.1.1
Efficiency
3.1.2
Operating Waveforms
3.1.2.1
Start-Up and Shutdown With EN
3.1.2.2
Switching
3.1.2.3
Load Transient (CV), ISET Modulation (CC)
3.1.3
Thermal Performance
3.1.4
Bode Plot
3.1.5
EMI Performance
4
Hardware Design Files
4.1
Schematic
4.2
PCB Layout
4.3
Bill of Materials
5
Additional Information
5.1
Trademarks
6
Device and Documentation Support
6.1
Device Support
6.1.1
Development Support
6.2
Documentation Support
6.2.1
Related Documentation
6.2.1.1
PCB Layout Resources
6.2.1.2
Thermal Design Resources
2.1.3.2
Output Connections
Connect electronic load to J5. Set the load to CV mode at 15V before applying input voltage.
Connect voltmeter 2 at VOUT+ and VOUT- test points to measure the output voltage.