- Before applying power to the LM74701-Q1EVM,
verify all external connections.
- Turn off external power supplies and connect them with the proper polarity to the VIN and GND1 connectors.
- An electronic or resistive load must be connected at the output VOUT and GND2 connectors.
- The tests outlined in this document are conducted with 3-A constant current as the load and 12 V at the input.
- Make sure that the external power-supply source for the input voltage is capable of providing enough current to the output load so that the output voltage can be obtained.
When all connections to the LM74701-Q1EVM are
verified, apply power to VIN. Figure 2-2 captures EVM board setup.