SBVU072 October 2021 TPS7A21
This section describes the jumpers and connectors on the EVM, and how to properly connect, set up, and use the TPS7A21EVM-059. Section 3.1 and Section 3.3 describe the test setup and operation for the TPS7A21 LDO. Section 3.2 and Section 3.4 describe the test setup and operation of the optional load transient circuit.